Skip to content
Office with ceiling cassette and wall-mounted air conditioning
For business

Commercial air conditioning

Offices, shops, cafes and server rooms. Wall, cassette, ducted and multi-zone systems from local installers.

Free, no obligation Standard or pre-charged systems
Quick answer

Commercial air conditioning is usually a standard split, multi-split, ducted or VRF system designed around the heat load of each space. It is fitted and commissioned by F-Gas certified engineers, cools and heats, and larger systems carry legal duties: regular F-Gas leak checks above certain refrigerant thresholds and, over 12 kW, a TM44 energy inspection at least every five years.

Updated October 2026

Premises

Where businesses use air conditioning

Offices

Screens, lighting and people add heat. Ceiling cassettes or wall units keep teams comfortable and productive.

Shops and showrooms

Doors opening all day and glazed frontages need units sized for the heat gain.

Cafes, restaurants and salons

Kitchens, equipment and customers create heat and humidity.

Server and comms rooms

Equipment rooms need cooling that runs reliably all year, often with backup.

Clinics, studios and gyms

Comfort for clients, with heating from the same system in winter.

Workshops and studios

Single-room units for smaller units and outbuildings.

System types

Commercial air conditioning systems

Commercial systems are standard installed systems, designed, fitted and commissioned by F-Gas certified engineers.

Wall-mounted split

Cost-effective for single offices and small shops.

Ceiling cassette

Sits flush in a suspended ceiling and spreads air in up to four directions. Popular in open-plan offices.

Ducted

Hidden above the ceiling, with discreet grilles. Ideal for fit-outs and refurbishments.

Multi-split and VRF

Several indoor units, or a whole building, on shared outdoor units. Systems can heat and cool different zones.

Open-plan office with ceiling cassette and wall-mounted air conditioning
Your project, start to finish

What a commercial project involves

Four phases from first visit to long-term care. Steps marked You are the ones that land on your desk.

  1. Step 1: Plan

    • Site survey

      Installer

      Heat loads, layout, ceiling type, electrics and where outdoor units can go.

    • Design and proposal

      Installer

      Unit types, sizes and zones, with a quote and programme of works.

  2. Step 2: Approve

    • Landlord and permissions

      You

      Consent from your landlord and, where needed, planning or listed building consent.

  3. Step 3: Install

    • Installation

      Installer

      Often phased or out of hours to keep the business running.

    • Commissioning and handover

      Installer

      Testing, controls set up for your team and handover documents.

  4. Step 4: Run

    • Maintenance

      You and installer

      A service plan keeps the system efficient, compliant and in warranty.

Rules for business premises

What applies to your business

Three things to check before and after your system goes in.

RuleWhen it appliesWhat is neededWho does it
Legal dutyF-Gas leak checksThe system holds refrigerant above set thresholds, measured by its climate impact.Leak checks at set intervals, with records kept.F-Gas certified engineer
Legal dutyAir conditioning inspection (TM44)England and Wales, where the combined cooling output is over 12 kW.An energy assessment at least every five years.Accredited energy assessor
TaxCapital allowancesYour business buys and installs a system.Often treated as plant and machinery for tax purposes.Your accountant
Costs

What affects the price of commercial air conditioning

Floor area, the number of zones, ceiling type, access and out-of-hours working all change the price. Ask every installer to quote for the same design.

System type

Standard or pre-charged, and wall-mounted, floor console, cassette or ducted indoor units.

Number of rooms

One room, or several rooms from a multi-split outdoor unit.

Unit size

The cooling and heating output each room needs, from about 2.5 kW to 7 kW and above.

Pipe run and walls

How far apart the indoor and outdoor units are, and what the pipework passes through.

Electrics

Whether a new dedicated circuit is needed from your consumer unit, and how far it runs.

Access and position

Upstairs rooms, wall brackets or a ground stand for the outdoor unit, and access equipment.

Compare commercial quotes

Before you get quotes

  • Floor area and ceiling height of each space
  • How many people and screens each area holds
  • Ceiling type: suspended grid, plasterboard or open
  • Where outdoor units could go, and roof or wall access
  • Landlord contact and any building rules
  • Working hours and when work can happen

What to compare in each quote

  • Heat load calculation and unit sizes for each zone
  • Equipment makes, models and controls
  • Electrical work and isolators
  • Commissioning, documentation and F-Gas records
  • Warranty terms and the service plan needed to keep them
  • Programme, phasing and out-of-hours costs
How it works

Three steps to your quotes

  1. Tell us about your rooms

    Home or business, how many rooms and the system type you would like.

  2. We match local installers

    Only installers who cover your postcode and fit your system type.

  3. Compare your quotes

    Weigh up prices, equipment and warranties, then choose, if you want to.

Why use us

Why use Air Conditioning Comparison?

  1. We’re independent.

    We don’t sell air conditioning and we don’t install it. We work for you, matching you only with vetted local installers who cover your area.

  2. Installers quote.

    Vetted local installers contact you directly with free quotes for your rooms, so you can compare like for like.

  3. You decide.

    There’s no obligation. Compare the quotes in your own time and go ahead only if one is right for you.

Trust and safety

What “vetted” means

We don’t pass your enquiry to just anyone. Before an installer receives enquiries through us, we check three things.

  • Relevant insurance

    We confirm public liability insurance is in place before any enquiry is passed on.

  • The right certification

    Standard systems must be fitted by an F-Gas certified engineer, as UK law requires, and the electrical work done by a qualified electrician.

  • Warranty

    Installations must be backed by a written warranty on the work, alongside the manufacturer’s warranty on the equipment, so you’re covered after the fitter leaves.

Commercial air conditioning: common questions

Do businesses need an F-Gas engineer?

Yes. Commercial systems are standard installed systems, and work on their refrigerant circuits must be done by F-Gas certified engineers.

What is a TM44 inspection?

An energy assessment of air conditioning systems required in England and Wales where the combined output is over 12 kW, carried out by an accredited assessor at least every five years.

How often should commercial air conditioning be serviced?

Most manufacturers recommend at least once a year, and busy or critical systems more often. Larger systems may also need regular F-Gas leak checks.

Can the system heat the office in winter?

Yes. Most commercial split, multi-split and VRF systems are heat pumps that heat and cool.

Can work be done out of hours?

Many installers offer evening or weekend working to avoid disruption. Ask for it to be included in the quote.

Do I need my landlord's permission?

Almost always. Leases usually require consent for drilling walls, fixing outdoor units or altering services.

Is a pre-charged system suitable for a business?

For a single small office or outbuilding it can be. Larger spaces and multiple rooms need a standard system.

How do I get quotes?

Enter your postcode, choose business premises and tell us about the space. Local commercial installers then send their quotes.

Ready to compare air conditioning quotes?

Free, no obligation. Takes a few minutes.

Get my quotes

General information only, not technical, legal or planning advice. Installers confirm system size, siting and any permissions for your property. Updated October 2026.

Sources: The Fluorinated Greenhouse Gases Regulations (GB) and GOV.UK guidance on F-gas; Approved Document P (electrical safety) and the Building Regulations for England and Wales; the Energy Performance of Buildings Regulations (air conditioning inspections); manufacturer installation guidance for split systems.

Commercial air conditioning